Ride Start: Deerfield Park
Please park on streets & gather at building
ROUTE SLIPS: DCP#02 (12/7/25)
Regroup: Kéan Coffee
@ Main and Newport in Tustin
Short: 14.8 miles (8.3) +186 ft {CF 1 12.6’/m}
Alton, Red Hill
https://ridewithgps.com/routes/34559013
After Coffee: The exit to MAIN at mile 8.4 will be on a short gravel segment and right turn onto narrowed travel lane of Main eastbound.
Medium: 32.1 miles (19.2) +659’ {CF 2 20.5’/m}
Campus, Von Karman, Irvine Bl
https://ridewithgps.com/routes/31573032
MAIN is under construction and no left turn is allowed:
DETOUR: At Mile 19.1, TURN LEFT onto Newport, then turn right at the first driveway into Tustin Plaza center.
After Coffee: The exit to MAIN at mile 19.2 will be on a short gravel segment and right turn onto narrowed travel lane of Main eastbound.
Long: 44.7 miles (27.5) +1,986 ft {CF 4 44.4’/m}
Spyglass, Back Bay, Newport Ave
https://ridewithgps.com/routes/31572976
MAIN is under construction and no left turn is allowed:
DETOUR: At Mile 27.4, TURN LEFT onto Newport, then turn right at the first driveway into Tustin Plaza center.
After Coffee: Exit to MAIN at mile 27.6 will be on a short gravel segment and right onto narrowed travel lane of Main eastbound.
Please share feedback suggestions & comments on this, or any BCI Ride with our Ride Coordinator.
Guests are welcome, but minors (<18) may only ride under the direct supervision of an adult guardian.
