The county has posted signs advising that the trail will be closed from Taft to Memory Lane, beginning January 22 through April 30, 2018.
Santa Ana River Trail Closure (Resolved)
The County will be closing a major portion of the Santa Ana River to all public access around January 22nd. All current residents are being moved out into other neighborhoods, and the remaining trash and pollution will need to safely be removed, and landscape restored. The Trail between Memory Lane and Ball/Taft will be closed until the summer of 2018.
We expect the County to post a detour, but unless they re-open the existing paved detour on the east bank between Memory Lane and Orangewood to get past the 22 & 5 freeways, the best on-street detour will likely go west on Memory Lane to Lewis, then north to Orangewood, then east back across the river to Eckhoff, then north to Collins, east to Main, and west on Taft to resume the off street bike path north of Taft.
Proposed detour reopening the existing east bank path:
The County has not yet announced their detour plan...
Great Park closed the perimeter road to public
Unfortunately the powers-that-be who are developing former MCAS El Toro into the Great Park have closed the old Perimeter Road to bicycles. This road runs along the south and east sides of the base. This eliminates the connection from Marine Way to Astor and Fairbanks in the East Irvine Industrial Complex which we enjoyed during the summer & fall of 2017.
Riders can still enter the area on Marine Way off Sand Canyon, but will have to turn left up either Ridge Valley or Sky Hawk/Bosque to Irvine Blvd. Bummer, especially for those of us who live in Lake Forest !
Photo by Jim Norman 11-4-17
Bay View Trail Closed Thru 9/15/17
10/1/17 update - the Trail is open again
OC Public Works will begin repairs on the Bay View Bridge at Upper Newport Bay located within the City of Newport Beach. Portions of the Brown/Bay View trail will be temporarily closed from July 31 to Sept. 15, 2017 for construction activities.
This is the trail that crosses the back bay between Jamboree and Irvine Ave. You can detour along Mesa Dr. just to the north. Here is a map of the detour.
Back Bay Road Closures - weekdays thru July 21
Newport Beach
Back Bay Drive will be closed between Shellmaker and San Joaquin Hills roads from 7 a.m. to 4 p.m. Monday through Friday until approximately July 21 due to crews trimming overgrown vegetation to make the roadway safer, officials said.
Information: 949-644-3055.
Louis Casiano Jr.
Santa Ana River Trail - Homeless Situation
Due to our winter rains and a construction project, homeless persons camping in the riverbed and along the east side of the river in the Orange/Anaheim area have moved alongside (and in come cases into) the bike trail.
The area most impacted is between the 5 freeway and Katella, along Anaheim Stadium. In online forums cyclists are reporting confrontations with the homeless in this area. You may want to consider alternate routes.
Red Hill Ave bridge over 405 is open again.
Construction near Santiago Canyon Road/Jamboree/241
Irvine Ranch Water District is converting the northern segment of its Irvine Lake Pipeline to recycled water. During the months of December and January, contractor trucks will be utilizing E. Santiago Canyon Road near Jamboree and the 241 Toll Road to transport dirt and materials. Traffic delays may be possible on Santiago Canyon Road during peak traffic hours. For more information, please visit http://www.irwd.com/construction/ilp-con...
Red Hill Ave. - Bridge over 405 closed to all traffic.
Red Hill is closed to all traffic over the 405 for repairs to the bridge and surrounding structure. Bikes cannot get through. Current information from the cities say that it will be closed through December 2016 with off-and-on closures into 2017.
Because this is between the 55 freeway and John Wayne Airport there are no good bike-friendly detours nearby. Your best bet is to modify your route to go east of the airport using Irvine Avenue/Campus and Von Karman.
Back Bay Road Closure - Sept 17, 2016
From the Newport Bay Conservancy:
On behalf of the Newport Bay Conservancy, I would like to let you know that Coastal Cleanup Day is Saturday, September 17th, from 9 AM-NOON. Because of this, the path on Back Bay Drive from San Joaquin Hills Road to Eastbluff Drive will be closed during that time.
Aliso Creek Trail Maintenance and Closures
The County of Orange will be working on the Aliso Creek Trail, repairing and slurry sealing the pavement, from September 2016 through November 2016. The work will take place on weekdays and the trail should be open and available to riders on weekends.
For more information, click HERE.
Irvine Boulevard is Getting Back to Normal
As of August 16, Irvine Blvd. is fully open between Modjeska and Allred, with new pavement, striping and bike lanes (and unfortunately a couple more traffic signals). Enjoy!
Santa Ana River Bikeway Detour
There is a detour in effect for the SART about midway between Weir Canyon Road and Gypsum Canyon Road. Riders will need to exit the trail and ride along La Palma in this area. This detour is expected to be in place until December 2017. This sign will be installed by the Army Corps of Engineer’s contractor at entrances to the detour:
The good news is the trail between Lakeview and Tustin is now open, it is no longer necessary to detour on Riverdale.
Jim Norman
San Diego Creek Trail bikeway at Spectrum
The San Diego Creek Trail extends from the Upper Newport Bay upstream to the Irvine Meadows Amphitheater. Up stream from going under the 133 Laguna Freeway, the route crosses the creek on a side path of the Spectrum road bridge, then continues along the creek under the 405 Freeway. This bridge has been closed to traffic and cyclist usually crossed in the road, but now is full of parked and moving construction vehicles so share the road. The side path - the wide side walk intended for trail users - has a temporary water pipe right across the path from the fire hydrant. This is a temporary supply but services the water fro the new construction yard at the end of Spectrum road... but may be a trip hazard for a long time. Also there are no painted crosswalks so watch out for traffic now when continuing on the trail across Spectrum, or crossing the road to use the connector to Pacifica.
Bill Sellin
Irvine Blvd from Modjeska to Alton
Irvine Blvd is being widened and curbed between Modjeska and Alton. Traffic is narrowed from 6 lanes to 2. The City of Irvine has done a great job of providing a generous bike lane, as well as slowing traffic speeds through the segments and the pavement is being kept in good shape.
Bill Sellin
Alton from Technology to Barranca in East Irvine
Alton has been narrowed in both directions during construction between to Barranca / Muirlands and Technology. There is a speed reduction, but the bike lane has been narrowed, contained within concrete barriers and the pavement is pretty rough; and as the travel lanes are wearing down, gravel & such is spreading into the bike lanes. Watch for vehicles turning right across your path of travel where the bike lane ends at Muirlands.
Bill Sellin
RE: Irvine Boulevard Construction
South of Modjeska to Allred, one lane in each direction due to construction. There is a reasonable shoulder/bike lane and the speed limit's been reduced, so it is not too bad. Occasionally during the week the bike lane is closed for construction equipment working along the side of the road. There is more road debris than normal due to construction activity.
Jim
Redhill over 405
Road construction has the bridge reduced to one lane in each direction with no shoulder or bike lane.
